From job details to agency decision, one record.
Roaddrafter drafts the plan. A licensed PE reviews and seals it. The agency reviews and decides. Every step is logged against the same plan.
The six steps
Step 1
Describe the job.
The contractor or agency staff enters the location, road, posted speed, lanes, work type and schedule.
Step 2
Get a structured draft.
Roaddrafter lays out the work zone and builds the sign schedule and device table, with MUTCD Part 6 references next to each value.
Step 3
Check the evidence.
Citations and assumptions are visible, so problems get caught before submission, not after.
Step 4
PE review and seal.
The PE in responsible charge reviews, edits or rejects the draft, then seals it. Every attestation is logged with PE license number, timestamp and the plan inputs it was made against.
Step 5
Submit to the agency.
The sealed plan goes to the agency's review queue with its evidence attached.
Step 6
Agency review and decision.
Reviewers see the same citations and history the PE saw. The agency issues its decision, and active work zones can be shared with GIS teams through WFS and WMS endpoints.
Draft automation supports engineering judgment. It does not replace it.
What each party gets
| Party | What changes |
|---|---|
| Contractor / permit requester |
|
| Professional Engineer |
|
| Agency reviewer |
|
| Agency program and operations |
|